Mongolian Powder Metallurgy Plant Is Expected To Compete In World Markets

Ulaanbaatar, Mongolia – Mongolia has built its first-ever European high-tech metal powder plant, with an annual capacity of 3,000 tons of powders
of copper, brass, bronze, tin, and other metals.

The plant was built by Steppe Metal Powder LLC in cooperation with Mongolian engineers and technicians and German experts.

The powder metallurgy plant is expected to export its products to countries and regions in high demand for metal powders, such as China, South
Korea, Japan, India, and the European Union.

Plant’s Technology Manager M.Chinbayar said the factory becomes an advanced technology that can be used in any field, adding that any type of
metal can be ground using atomization technology.

Its Executive Director Askhar Bakyei said the factory, which started operation last month, April, faces temporary challenges in logistics.

He said through powder metallurgy and 3D printing, metal powder can be used to produce high-end parts for automotive and industrial equipment.

Since its opening, Stepp Metal Powder plant has worked with companies interested in producing automotive parts and components in Mongolia,
particularly brake pads, according to Ashar.

The executive director said they focus on quality products to meet the requirements of international markets, using LME (London Metal
Exchange) Grade A copper cathodes as feed.

“It seems that we have paved the way for in-country industrial capacity for many modern metallurgical processes, such as hot isostatic pressing, metal injection molding, and additive manufacturing,” he added.

0 6 Continue Reading →

Advanced technology metallurgical plant opens in Mongolia

Ulaanbaatar /MONTSAME/. ‘Steppe Metal Powder’ Company has opened its export-oriented metallurgical facility that produces copper and copper alloy powders from copper scraps and copper cathode. Metal powder is being produced in over 20 countries including Germany, Japan, China and UK. Mongolia now became able to domestically produce the world-class metallurgical products.

Mongolian engineers in collaboration with British and German specialists have constructed the facility for two years and started an experiment from last January.  With the commissioning of the plant, it becomes possible to produce export-oriented value-added products, and the metal powder is used to produce small automotive parts such as spark plugs, gears, electric brushes, vacuum switches, as well as 3D printing, jewelry, ornaments, computers and mobile phones.

With an annual production capacity of 3,000 tons of powdered metal, the plant uses 99 percent of its raw materials and is environmentally friendly with up to 90 percent recycling technology. Specialists consider Mongolia has enough raw materials as the country makes 200 tons of copper scraps per month.

Present at the opening of the metallurgical plant were Deputy Prime Minister S.Amarsaikhan, former President P.Ochirbat, Minister of Mining and Heavy Industry G.Yondon and other officials.

Deputy Prime Minister S.Amarsaikhan wished success to Steppe Metal Powder that has established the plant and made a valuable contribution to the country’s industrialization, and said, “At a time when the whole world is under difficult socio-economic situation, the Mongolian government has proposed to implement the New Revival Policy. At a time when we are making effort to elevate industrial development to a new level, a metallurgical plant that demonstrates technological progress and the skills of Mongolian engineers is being put into operation. Domestic metal processing has been stepped up and export-oriented value-added product start being produced, which is contributing to the development of the country’s industrial policy. The metal powder is an essential raw material for 4th industrial revolution and we are glad that the foundation has been laid to produce it in Mongolia.”

During the opening ceremony, the plant authority said that it will be able to produce not only copper powder, but also all kinds of metal powders such as steel, silver, iron, nickel and chromium.

zurag

Currently, the plant is negotiating with China to export its products, and has sent samples of its products to Japan, the United Kingdom and South Korea for further supply.

 

Source: https://www.montsame.mn/en/read/294617

0 0 Continue Reading →

World PM2022 Congress & Exhibition will be held in Lyon

WorldPM is the leading conference on powder metallurgy that provides the unique opportunity of exchanging experiences and new ideas for professionals from every part of the industry including producers, buyers and academia.

The next World PM Congress & Exhibition will be held in Lyon, France from 9 – 13 October 2022. The event will feature insights relating to Additive Manufacturing, Environment and Sustainability, Functional Materials, Hard Materials and Diamond Tools, Hot Isostatic Pressing, Metal Injection Moulding, Materials and Processes for Specific Applications, and Press & Sinter.

Source: https://www.worldpm2022.com/

0 1 Continue Reading →

Member of Parliament Undram Chinbat paid visit

Undram Chinbat, a member of the Parliament of Mongolia, visited the SMP site on 2 September 2020. The SMP team provided a detailed introduction on plant technology, processes, and facilities during the visit. At the same time, Mrs. Undram was updated on the company’s recent activities and future objectives. It was also noted that SMP is an important project for the development of Mongolia’s industrial capacity by paving the way for high technology business opportunities. Mrs.Undram congratulated the SMP team for its dedication and wished further success in their future endeavors.

2 Continue Reading →

IIB grants a loan to Steppe Metal Powder LLC

International Investment Bank and Steppe Metal Powder LLC (SMP) from Mongolia have concluded a loan agreement for the amount of 8 million euros for a period of 6 years. The first tranche of the loan was transferred on June 5, 2020.

The funds allocated by the Bank will be used for the construction and installation of a modern high-tech plant that will produce copper and copper (bronze, copper and brass) alloy powders in Mongolia.

Introducing the most advanced British and German technologies and equipment, the plant, which is scheduled for a launch at the second half of 2021, will have the production capacity of 3,000 metric tons of metal powders per year.

Source: https://iib.int/en/articles/iib-grants-a-loan-to-steppe-metal-powder-llc-in-support-of-a-high-tech-metal-powder-plant-to-be-cons

 

2 Continue Reading →

Grace Fabrications were responsible for the installation of the ventilation system supplying clean air to the largest smelting factory outside of Europe

Grace Fabrications were responsible for the installation of the  ventilation system supplying clean air to the largest smelting factory outside of Europe. With a view to become one of the largest Copper powder suppliers in the world Steppe Metal Powders appointed Grace Fabrications sole contractor. A team of our staff were fortunate enough to travel to Mongolia from the UK to install the system from start to finish.

 

Source: https://www.gracefabrications.co.uk/project/steppe-metal-powders/

0 0 Continue Reading →

STEPPE Metal Powder – Mongolia

After two years planning, meetings and consultations Thomas Halliwell have completed the M&E design and the containment installation has commenced for our engineers on this next copper smelting plant overseas project.

Sharing is caring!

Read more: https://www.thomashalliwell.co.uk/steppe-metal-powder-mongolia/

0 1 Continue Reading →